Thai cabinet approved a MOU draft for development of trains between Thailand and China, using the 1.435 meter standard gauge track. This will be submitted to the National Legislature to approve it before signing. The content deals with G-to-G cooperations in the construction of parallel tracks in the 731 km route (from Nong Khai - Nakhon Ratchasima - Kang Khoi - Mab Ta Phut port) and a 133 km route (Bangkok - Kang Khoi).
Ref Thai Publica
No comments:
Post a Comment